RFIRT Rebuild Photos 1 - Move and Disassembly

Thanks to the generosity of G&G Metalmecanica SRL and its President, Mr. Gabriel Asenjo, CSR is able to provide images of the move of RFIRT locomotives 107 and 119 from Rio Turbio to Buenos Aires, Argentina. Also shown is preliminary disassembly work of the locomotives.

Note: some time ago, RFIRT renumbered locomotive 107 to 116. The design of its tender and tube plate reveal it is, indeed, from the first order of steam locomotives to the RFIRT.

Below is an embedded version of the CSR Photostream on Flickr.

RFIRT 119